Contact Us

Sheyang County Chenyang Sewage Treatment Co., Ltd. Tail Water East Delivery Project

Project introduction

This project is a key component of the sewage pipe network system in Sheyang County. The project carries the important mission of transporting and purifying tail water, connecting regional treatment systems, and ensuring that final discharge meets standards. The "Kangyu" brand pipes of Shandong Kangyu Pipe Industry Co., Ltd. are designated as the special pipes for this project due to their excellent durability, excellent anti-seepage and excellent anti-corrosion properties recognized in the field of municipal drainage, laying a solid "underground artery" for the water environment management and sustainable development of Sheyang County.


Project Overview

Key functions: Responsible for transporting the tail water treated by Chenyang Sewage Treatment Plant to the sewage discharge port of the East District Sewage Treatment Plant safely, stably and without leakage. It is the last transportation guarantee to achieve centralized, efficient and up-to-standard treatment of sewage in the county. High environmental requirements: The transportation medium is treated tail water. Although it has been treated, it may still contain certain chemical substances, which imposes strict requirements on the long-term corrosion resistance and anti-permeability of the pipe. Any leakage may cause secondary pollution to the soil and groundwater along the way. Dual value of people's livelihood and industry: directly related to the continuous improvement of the regional water environment, creating a better ecological and livable environment for local residents, and also providing the necessary environmental capacity and infrastructure support for industrial development.